Case Studies
All Segments
Infrastructure
Light Industry
Oil & Gas
Petrochemicals
Power Generation
UNIVERSITY OF DUBAI
Category: Infrastructure
Location: Dubai
Environment: C4
Main Contractor: Samsung Engineering
Owner: University of Dubai
Applicator: Standard Fabrication Dubai
Surface Preparation: Abrasive Blasting To Sa 2.5
Paint System
Primer: Zincanode 620 - 75 Microns
Intermediate: Epimastic 4000 M - 175 Microns
Finish: Luxathane 5160 RAL 9001 - 50 Microns
BUSINESS BAY DISTRICT COOLING PLANT
Category: Infrastructure
Location: Dubai
Environment: C4
Main Contractor: Trans Gulf Electro Mech
Owner: Empower
Applicator: Emirates Trading Agency - Mech Division
Surface Preparation: Abrasive Blasting To Sa 2.5
Paint System
Primer: Zincanode 690 - 75 Microns
Intermediate: Epilux 58 MIO - 125 Microns
Finish: Luxathane 5160 - 75 Microns
PDO AL NIMR PERMANENT ACCOMODATION CAMP
Category: Infrastructure
Location: Oman
Environment: C3
Main Contractor: Techno Gears Industries
Owner: PDO
Applicator: Techno Gears Industries
Surface Preparation: Abrasive Blasting To Sa 2.5
Paint System
Primer: Epilux 78 Redoxide
Intermediate: Epilux 218 HB
Finish: Luxathane 5000 RAL 1010 / RAL 7042
SHEIKH MANSOUR COMMERCIAL BUILDING
Category: Infrastructure
Location: Qatar
Environment: C4
Main Contractor: Red Line
Owner: Sheikh Mansour Bin Jaber Al Thani
Applicator: Quatar Steel Technologies
Surface Preparation: Abrasive Blasting To Sa 2.5 / Manual Cleaning
Paint System
Primer: Epilux 77 Redoxide - 75 Microns
Finish: Epilux 4 Finish RAL 9001 - 50 Microns
FIRE WATER LINE NEW ADNOC HEAD QUARTERS
Category: Infrastructure
Location: Abu Dhabi
Environment: C3
Main Contractor: Six Construct
Owner: Adnoc
Applicator: International Electro Mechanical Services
Surface Preparation: Light Abrasion on Galvanized Surface
Paint System
Primer: Luxaprime 1500 - 5 - 10 Microns
Finish: Rapid Air Dry 15 - 2 Coats - 50 - 60 Microns Per Coat
CAR PARK STRUCTURE NEW ABU DHABI AIRPORT
Category: Infrastructure
Location: Abu Dhabi
Environment: C4
Main Contractor: Larse & Toubro Limited (ECC Construction Group)
Owner: Abu Dhabi Airports Company PJSC
Applicator: Emirates Tents LLC
Surface Preparation: Abrasive Blasting Sa 2.5
Paint System
Primer: Zincanode 620 - 75 Microns
Intermediate: Epilux 219 Grey - 125 Microns
Finish: Luxathane 5160 - 75 Microns
DUBAI BOAT STORAGE PROJECT
Category: Infrastructure
Location: Dubai
Environment: C5 - M
Main Contractor: Galadari Engineering Works
Owner: Deyaar Development LLC
Applicator: Galadari Engineering Works
Surface Preparation: Abrasive Blasting To Sa 2.5
Paint System
Primer: Zincanode 690 - 50 Microns
Intermediate: Epimastic 4000 M - 115 Microns
Finish: Luxathane 5160 - 75 Microns
KING ABDULLAH SPORT CITY - KSA
Category: Infrastructure
Location: KSA
Environment: C4
Main Contractor: Multifroms
Owner: Govt. Of Saudi Arabia
Applicator: Gopinathan Enterprises
Surface Preparation: Abrasive Blasting To Sa 2.5
Paint System
Primer: Epimastic 5100 AL - 100 Microns
Intermediate: Epimastic 5100 AL - 100 Microns
Finish: Luxathane 5160 Grey - 2 * 50 Microns
QSTEC POLYSILICON PROJECT, QATAR
Category: Infrastructure
Location: Qatar
Environment: C4
Main Contractor: Punj Lioyd
Owner: Qatar Solar Technologies
Applicator: Emirates Trading Agency - Mech Division
Surface Preparation: Abrasive Blasting To Sa 2.5
Paint System
Primer: Zincanode 690 - 75 Microns
Intermediate: Epilux 58 Mio - 125 Microns
Finish: Luxathane 5160 - 75 Microns
STRUCTURES FOR CATERPILLAR
Category: Light Industry
Location: Sharjah
Environment: C3
Main Contractor: Mohd Al Bahar
Owner: Caterpillar
Applicator: Mohd Al Bahar
Surface Preparation: Power Tool Clean / Abrasive Blasting To Sa 2.5
Paint System
Primer: Epilux 78 - Luxatherm 1600 - Luxaprime 1500
Finish: Luxathane 5000 - Luxatherm 5600 - Luxaprime 5000
GAS CYLINDERS FOR ENOC
Category: Light Industry
Location: Dubai
Environment: C3
Main Contractor: Enoc
Owner: Enoc
Applicator: Emirates Gas LLC
Surface Preparation: Air Blowing To Remove Dust
Paint System
Primer Cum Finish: QD Enamel Red - 50 Microns
SIGN AND GANTRY POSTS FOR KHALIFA PORT
Category: Light Industry
Location: Abu Dhabi
Environment: C4
Main Contractor: Consolidated Cont Eng & Procurment S.A.L - Offshore
Owner: Abu Dhabi Port Company
Applicator: Cicin Signs And Metal Works
Surface Preparation: Light Abrasion And Solvent Cleaning of galvanized Surface
Paint System
Primer: Epilux 78 Grey - 40 - 60 Microns
Intermediate: Epilux 210 Grey - 130 - 160 Microns
Finish: Robbiathane Black And White - 40 - 60 Microns
MANHOLE COVERS FOR HIDD AL SAADYAT
Category: Light Industry
Location: Abu Dhabi
Environment: C5
Main Contractor: Gulf Contracting
Owner: A.D.D.C
Applicator: Abu Dhabi Carnation Metal Industries
Surface Preparation: Abrasive Blasting To Sa 2.5
Paint System
Primer: Zincanode 500 - 50 Microns
Intermediate: Epimastic 4100 M - 2 * 250 Microns
Finish: Luxathane 5160 RAL 5015 - 50 Microns
RUWAIS SULPHUR EXPANSION (PHASE 3)
Category: Petrochemical
Location: Abu Dhabi
Environment: C5
Main Contractor: Dodsal Pte LTD
Owner: Takreer
Applicator: Dodsal Pte LTD
Surface Preparation: Abrasive Blasting To Sa 2.5
Paint System
Primer: Zincanode 330 - 75 Microns
Intermediate: Epilux 219 - 125 Microns
Finish: Luxathane 5160 - 75 Microns
70 TPD CHLOR ALKALI PLANT
Category: Petrochemical
Location: Abu Dhabi
Environment: C4
Main Contractor: Engineering And Contractor LLC
Owner: Maa Kuthari Global
Applicator: Fabtech - Abu Dhabi
Surface Preparation: Abrasive Blasting To Sa 2.5
Paint System
Primer: Zincanode 330 - 75 Microns
Intermediate: Epilux 219 - 175 Microns
Finish: Luxathane 5160 RAL 9023 - 75 Microns
LPG TANKS FOR EMIRATES PALACE HOTEL
Category: Petrochemical
Location: Abu Dhabi
Environment: C5
Main Contractor: Fameco
Owner: Emirates Palace Hotel
Applicator: Fameco
Surface Preparation: Abrasive Blasting Standard To Sa 2.5
Paint System
Primer: Epliux 610 - 50 Microns
Finish: Steelshield 1200 - 2 * 250 Microns
400 KV OHL CONTRACT N 12037
Category: Power And Transmission
Location: Abu Dhabi
Environment: C4
Main Contractor: KEC International
Owner: Transco
Applicator: Sea Rock LLC
Surface Preparation: Light Abrasion with Emery Paper / Wire Brush And Cleaning With Berger Tool Cleaner On GI
Paint System
Primer: Luxaprime 1500 - 6 - 8 Microns
Intermediate: Epilux 58 - 75 Microns
Finish 1: Luxathane 6050 RAL 9010 - 2 * 50 Microns
Finish 2: Luxathane 6050 RAL 2002 - 2 * 50 Microns
SHUWEIHAT POWER STATION SURGE VESSELS
Category: Power And Transmission
Location: Abu Dhabi
Environment: C4
Main Contractor: GPC
Owner: TranscO
Applicator: ADCE
Surface Preparation: Abrasive Blasting To Sa 2.5
Paint System
Primer: Zincanode 330 - 50 Microns
Intermediate: Epilux 219 - 125 Microns
Finish: Luxathane 5160 RAL 9006 - 60 Microns
GRP PIPES REVERSE OSMOSIS PROJECT
Category: Petrochemical
Location: Fujairah
Environment: C5
Main Contractor: ACCIONA
Owner: Emirates Sambcorp Water And Power Company / Adwea
Applicator: ACC- Abu Dhabi
Surface Preparation: Mechenical Cleaning To ST2
Paint System
Finish: Luxathane 5000 RAL 9004 - 50 Microns
Finish: Luxathane 5000 RAL 9010 - 50 Microns
Jack Up Barge Legs
Category: Oil And Gas
Location: Abu Dhabi
Environment: C5 M
Main Contractor: Gulf Ppiping Company
Owner: Gulf Drilling International - Qatar
Applicator: Abu Dhabi Coating Enterprise
Surface Preparation: Abrasive Blasting To Sa 2.5
Paint System
Luxathane 5160 RAL 7042, RAL 3020, RAL 9003 - 50 Microns
SELF ELEVATING AND PROPELLED JACK UP CRA
Category: Oil And Gas
Location: Abu Dhabi
Environment: C5 M
Main Contractor: Gulf Piping Company
Owner: Gulf Drilling International - Qatar
Applicator: ADCE
Surface Preparation: Abrasive Blasting To Sa 2.5
Paint System
Primer: Epimastic 5100 AL - 150 Microns
Intermediate: Epimastic 4000 M - 150 Microns
Finish: Luxathane 5000 - 50 Microns
16" CONDENSATE PIPE LINE GASCO PROJECT
Category: Oil And Gas
Location: Abu Dhabi
Environment: C4
Main Contractor: Essar Engineering
Owner: GASCO
Applicator: Essar Engineering
Surface Preparation: Abrasive Blasting To Sa 2.5
Paint System
Primer: Zincanode 330 - 75 Microns
Intermediate: Epilux 58 M.I.O - 125 Microns
Finish: Luxathane 5160 RAL 7035 - 75 Microns
INTER REFINERIES PIPELINE PROJECT 6089
Category: Oil And Gas
Location: Abu Dhabi
Environment: C4 / C5
Main Contractor: Dodsal PTE LTD
Owner: TAKREER
Applicator: Dodsal PTE LTD
Surface Preparation: Abrasive Blasting To Sa 2.5
Paint System
Primer: Zincanode 330 - 75 Microns
Intermediate: Epilux 219 - 125 Microns
Finish: Luxathane 5160 - 75 Microns
Finish: Luxathane 6200 / 5600 - 2 * 25 Microns
ESI CARBON CAPTURE AND STORAGE RECOVERY
Category: Oil And Gas
Location: Abu Dhabi
Environment: C4
Main Contractor: Dodsal Engineering
Owner: MASDAR - ADNOC
Applicator: Dodsal Engineering
Surface Preparation: Stainless steel - Sweep blasting / Mild steel - Abrasive Blasting To Sa 2.5
Paint System
System 1
Primer: Epilux 219 - 150 Microns
Finish: Luxathane 5160 RAL 9010 - 75 Microns
System 2
Primer: Epimastic 5100 AL - 150 Microns
Finish: Luxathane 5160 RAL 1023 - 75 Microns
SHEET PILES FOR HAIL FIELS DEVELOPMENT
Category: Oil And Gas
Location: Abu Dhabi
Environment: C5
Main Contractor: NMDC
Owner: ADOC
Applicator: Febtech Abu Dhabi
Surface Preparation: Abrasive Blasting To Sa 2.5
Paint System
Primer: Epilux 78 - 75 Microns
Intermediate: Steelshield 1200 RAL 3016 - 375 Microns
Finish: Steelshield 1200 RAL 9005- 400 Microns